Cyber9 — Where compliance meets innovation
For defense manufacturers

Get CMMC-ready without stopping the shop floor.

Cyber9 scopes, builds and documents your Level 1 or Level 2 environment — then keeps it audit-ready. A 30-minute consultation gives you a clear next step.

MN

Michael Nielsen

Founder, Cyber9

30-minute scoping call

  • Which CMMC level your contracts actually require
  • Whether an enclave keeps your shop floor out of scope
  • A realistic timeline and what it takes from your team
Contact Us

No cost, no obligation.

devices — the size of shops we work with
readiness programs, documentation and SPRS
enclaves built for CUI and ITAR work
financing available for one-time costs
Trusted by

Defense manufacturers already working with Cyber9

Client engagements

Shops like yours, already in motion.

You won’t see client names here. Defense suppliers don’t advertise where their CUI lives — and neither do we. References are available on request.

Precision machining14 devicesCMMC Level 2

Off Google Workspace and into a GCC High environment built for CUI.

  • Migration from Google Workspace to Microsoft GCC High
  • Managed security on every device, plus compliance monitoring
  • Level 1 and Level 2 readiness program and documentation
  • One-time costs financed over 36 months

Discovery underway

ITAR manufacturer4 workstations + 2 machine controllersLevel 1, then Level 2

Level 1 baseline first, then an ITAR enclave — machine controllers included.

  • Level 1 baseline before any billing started
  • Level 2 ITAR enclave in GCC High as the next phase
  • CAD/CAM software licensing folded into the program
  • Shop-floor machine controllers covered, not just office PCs

Enclave build

Engineering firm3 devicesCMMC Level 2

A three-person team replacing a stop-gap file tool with a real CUI enclave.

  • GCC High enclave replacing an interim encrypted file-sharing tool
  • Level 2 documentation and SPRS score
  • Review of CUI inside the shop's ERP system
  • Physical-security hardware within a fixed budget

Enclave build

Two-person shop2 devicesCMMC Level 2

Proof that small shops fit: Level 2 without a big-company budget.

  • Managed security and monitoring from day one
  • Implementation fee split into four payments
  • Financing for the readiness program

Onboarding

How it works

From first call to audit-ready.

  1. 01 Site survey

    We walk the shop and the network: devices, users, vendor access and where CUI actually flows. You get a written report.

  2. 02 Scope & proposal

    Enclave or full environment, Level 1 or Level 2. A fixed one-time program plus simple per-device monthly pricing.

  3. 03 Build

    GCC High where it’s needed, managed security on every device, controls implemented without stopping production.

  4. 04 Document & score

    Policies, evidence and your SPRS score — written to match how your shop really runs.

  5. 05 Stay ready

    Continuous monitoring and evidence upkeep, so the annual affirmation or assessment isn’t a scramble.

Shop floorCUI enclave

Everything a CMMC program needs, from one team.

A fixed one-time program, then simple per-device monthly pricing. No surprise line items.

CMMC readiness program

Level 1 and Level 2 scoping, policies, evidence library and SPRS score.

GCC High enclave

A protected Microsoft environment for CUI and ITAR work — so the whole shop floor isn’t in scope.

Managed security

Endpoint protection, patching and hardening on every enrolled device, including shop-floor PCs.

Continuous monitoring

SOC-backed detection and response, plus the monitoring evidence assessors ask for.

IT onboarding

Account clean-up, MFA, firewall and network segmentation for guest and vendor access.

Financing

One-time program costs can be financed over 36 months through a third-party funder.

Contact Us

Bring your contract requirements and a rough device count. You’ll leave knowing your level, your scope and your timeline.

MN

Michael Nielsen

Founder, Cyber9

  • Which CMMC level your contracts actually require
  • Whether an enclave keeps your shop floor out of scope
  • A realistic timeline and what it takes from your team